Section 210. Definitions.
As used in this charter:
(a) A project which provides for the construction, reconstruction, acquisition or installation of a physical public betterment or improvement which would be classified as a capital asset under generally accepted accounting principles for municipalities or any preliminary studies and surveys relative thereto or any underwriting or other costs incurred in connection with the financing thereof.
(b) The acquisition of property of a permanent nature including wharf property.
(c) The acquisition of any furnishings, machinery, apparatus or equipment for any public betterment or improvement when such betterment or improvement is first constructed or acquired.
(d) Any public betterment involving either a physical improvement or the acquisition of real property for a physical improvement consisting in, including or affecting:
(1) Streets and parks;
(2) Bridges and tunnels;
(3) Receiving basins, inlets and sewers, including intercepting sewers, plants or structures for the treatment, disposal or filtration of sewage, including grit chambers, sewer tunnels and all necessary accessories thereof;
(4) The fencing of vacant lots and the filling of sunken lots.
(e) Any other project allowed to be financed by the local finance law, with the approval of the mayor and the comptroller.
(f) Any combination of the above.
(a) Purposes and public to be served;
(b) Programs to be conducted in the facility;
(c) Gross and net amounts of space and bulk for any building or structure and for areas for different functions and activities;
(d) Identification of required architectural, engineering or other consultants and estimated fees for such consultants;
(e) Estimated completion dates for scope, design and construction;
(f) Total estimated project costs, including costs for site acquisition, preparation and tenant relocation, design, construction and equipment;
(g) Estimated expenditures for the project for each fiscal year until its completion;
(h) Estimated annual costs to operate programs within the facility when fully staffed and to maintain the facility; and,
(i) Such other information as shall be required by the mayor or by resolution of the council.
Section 211. Capital budget borough allocations.
1. Each borough president, during the consultations required by section two hundred forty-four, shall submit to the mayor, in such form as the mayor shall prescribe, proposed capital appropriations in an amount not exceeding that borough’s allocation of the capital budget borough allocation as certified by the mayor to the borough presidents during such consultations. The timing of such certification shall allow sufficient time for such consultations and for meeting the deadlines established by section two hundred forty-nine. Each such proposed appropriation shall be accompanied by the following information:
(a) for each such proposed appropriation for construction of a capital project, the estimated annual cost to operate and maintain the facility to be constructed pursuant to such appropriation when construction is completed. Such estimates shall be prepared in accordance with the standards established for this purpose pursuant to section two hundred twenty-one of this chapter and shall be certified by the director of the office of management and budget. In the event that a borough president and the director of management and budget do not agree on such estimate for a particular project, such director and the director of the independent budget office shall jointly certify an estimate for such purpose;
(b) for each such proposed appropriation for the planning and design of a capital project, (i) the estimated cost of the construction of the project, and (ii) the fiscal year in which the borough president intends to propose an appropriation for the construction of the project, if no technical problems regarding the viability of the project are identified during planning, site selection or design;
(c) the total of all appropriations which will be necessary during the three ensuing fiscal years to provide for the construction of projects for which planning and design appropriations are being proposed.
2. If a borough president proposes an appropriation for the construction of a capital project, the appropriation must provide for the total amount estimated to be necessary for the completion of the project. If such a proposed appropriation for the construction of a capital project is for an amount which is less than the amount that the office of management and budget estimates to be necessary for the completion of the project, the borough’s capital budget borough allocation in any future year in which additional appropriations are necessary for the completion of the project shall be reduced by the amount of such additional appropriations.
3. If the total appropriations necessary, during any of the ensuing three fiscal years, to provide for the construction of (i) projects for which the borough president is proposing appropriations for planning and design, and (ii) projects for which appropriations were previously made for planning and design on the recommendation of the borough president, is greater than the capital budget borough allocation anticipated to be available during such years based on the certificate issued pursuant to paragraph sixteen of section two hundred fifty of this charter, then the borough president shall submit for inclusion in the executive budget a list of the projects requiring construction appropriations during such year, in priority order.
4. If the estimated annual cost to operate and maintain the capital projects being proposed for construction by a borough president is greater than the amounts dedicated to such expense budget purposes from the expense budget borough allocation and the capital budget borough allocation expense budget contingency projected to be available to the borough president in one or more ensuing fiscal years then such proposed appropriations may only be included by a borough president in the capital budget with the concurrence of the mayor.
Section 212. Format of departmental estimates for capital projects, preliminary capital budget and executive capital budget.
The departmental estimates for capital projects and the executive capital budget shall consist of a detailed estimate of all capital projects pending or which the agency head, for departmental estimates, or the mayor, for the executive budget, believes should be undertaken within the ensuing fiscal year and the three succeeding fiscal years. Each agency head, for departmental estimates, and the mayor, for the executive budget, shall submit a written response to each of the capital budget priorities included in the community board’s statement of budget priorities submitted in accordance with section two hundred thirty. Such responses shall include the response of the agency head and the mayor, as appropriate, regarding the disposition of each such priority and meaningful explanations of any disapprovals contained in such estimates or budget.
Section 213. Preliminary capital budget.
The preliminary capital budget shall consist of: (1) a financial plan, consistent with section two hundred fifty-eight, covering estimates of capital expenditures for the four ensuing fiscal years, (2) departmental estimates for capital projects as provided in section two hundred twelve together with the cash flow requirements and proposed sources of funding for each project included in such estimates, (3) a capital program status report which sets forth the appropriations for each project included in the capital budget for the current fiscal year together with the expenditures to date, and (4) a summary description of the purpose of each capital project and the needs it will fulfill, the schedule for beginning and constructing the project, its period of probable usefulness and an appropriate maintenance schedule.
Section 214. Executive capital budget.
(1) A brief description and the location of each project; the total estimated cost of the project; the appropriations which have been previously adopted for this project; the amount of appropriations recommended to be adopted for the ensuing fiscal year, the aggregate amount of which shall not exceed the amount in the mayor’s certificate; the amount of appropriations required thereafter to complete the project; the sources of funds for the project including state, federal, private and other funds; the period of probable usefulness; the estimated additional annual maintenance and operation costs; any terms and conditions of the project; and the estimated dates of completion of final scope, final design and final construction;
(2) A listing of all pending projects; and any recommendations that any pending projects be modified, rescinded or postponed accompanied by a statement of the budgetary impact of any such action; and
(3) A listing of proposed capital projects by community district and by borough and an identification of those projects which were included in the statement of capital priorities submitted by each community board and borough board.
(1) A statement for each of the three succeeding fiscal years of the total dollar amounts necessary to complete projects initiated in prior years and projects proposed in the executive budget, the amounts necessary for projects proposed to be initiated in future years and the amounts necessary for amendments and contingencies; and
(2) A statement of the likely impact on the expense budget of staffing, maintaining and operating the capital projects included in or contemplated by the capital program.
Section 215. Ten-year capital strategy.
(1) a narrative describing the strategy for the development of the city’s capital facilities for the ensuing ten fiscal years; the factors underlying such strategy including goals, policies, constraints and assumptions and the criteria for assessment of capital needs; the anticipated sources of financing for such strategy; and the implications of the strategy, including possible economic, social and environmental effects;
(2) tables presenting the capital commitments estimated to be made during each of the ensuing ten fiscal years, by program category and agency. Where relevant the anticipated sources of financing for particular categories and projects shall be specified; and
(3) a map or maps which illustrate major components of the strategy as relevant.
Section 216. Amendment.
Section 217. Restrictions on capital projects.
Section 218. Site selection.
Section 219. Project initiation; commitment plan.
1. The report issued with the executive budget shall include, for each new capital project being proposed in the executive budget, a description of the project including, to the extent practicable, the information required to be included in a scope of project by paragraph four of section two hundred ten.
2. The report issued following the adoption of the budget shall include, for each capital project added to the budget, a description of the project including, to the extent practicable, the information required to be included in a scope of project by paragraph four of section two hundred ten.
3. The report issued following the adoption of the budget shall include, for each capital project for which a substantial change was made, a revised description of the project including, to the extent practicable, the information required to be included in a scope of project by paragraph four of section two hundred ten.
Section 220. Improvements payable other than by city.
Any owner of real property or any other person interested may apply to the council to authorize an improvement referred to in paragraph d of subdivision one of section two hundred ten hereof, not included in the capital budget. The council may authorize such improvement to be made by the city or by such owner or other person interested upon compliance with the following conditions:
1. Such owner or group or other persons interested shall enter into an agreement with the city, whereby they will either authorize the city, or themselves agree, to perform such work in accordance with such plans and specifications approved by the agencies having jurisdiction thereover and under their supervision.
2. All of such work shall be done for the account of or at the sole cost and expense of the person or persons applying for permission to do the same, who shall furnish to the city such security and in such amount as may be required to secure the payment of such cost and expense or the proper performance of the said work in the time and in the manner agreed upon, and shall further secure the city, in the latter case, against latent defects in such work for a period of two years.
3. Such improvement shall be approved by the city planning commission and reviewed pursuant to sections one hundred ninety-seven-c and one hundred ninety-seven-d.
4. Any agreement providing for the performance of such work and the furnishing of such security, shall be first approved by the council before the same shall become effective.
Section 221. Standards for capital projects.
The mayor shall prepare general standards and cost limits for categories of capital projects and standards for the preparation of the scope of project for capital projects of various types. Such standards and limits shall be submitted by the mayor to the council for review. The proposed standards shall become effective thirty days after they have been filed with the council unless within that time the council modifies or disapproves them or part of them, after conducting a public hearing. Any modification by the council shall be subject to disapproval by the mayor in accordance with section thirty-eight and any such disapproval shall be subject to override by the council in accordance with such section.
Section 222. Scope of project.
Section 223. Design of capital project.
The proposed design and final design for a capital project shall be made available for review to the respective council committee, borough president and the community board for the community district in which the project is to be located. The mayor or his representative shall review the final design to determine its conformance with the approved scope of project pursuant to this chapter.
Section 224. Works of art.
Demographic information. The term “demographic information” includes age, gender, race and any other related information the department of cultural affairs deems relevant.
Design agency. The term “design agency” means the agency responsible for the preparation of the design for the capital project that includes works of art pursuant to this section.
Sponsor agency. The term “sponsor agency” means the agency whose capital project is subject to the provisions of this section.
Works of art. The term “works of art” includes all forms of the visual and performing arts conceived in any medium, material or combination thereof.
2. Reasonable advance notification of the intention to include works of art in a project shall be provided to the appropriate council member, borough president and chairperson of the community board of the community district in which the project is located. Reasonable advance notification of the intention to include works of art in a project shall also be posted on the website of the department of cultural affairs. Following notification of the intention to include works of art in any project, the department of cultural affairs shall hold or present at a public meeting, such as a meeting of the community board of the community district in which the project is located, on such works of art prior to such inclusion. A notice of such public meeting shall be posted on the website of the department of cultural affairs not less than fourteen days prior to any such meeting. All such works of art shall be subject to the approval of the art commission pursuant to section eight hundred fifty-four of this charter.
1. Such information shall include but not be limited to the name of the work of art; name of the artist; capital project completion date; medium and dimensions of the work of art; location of the work of art, including council district and borough; sponsor agency; and design agency.
2. The department shall post on the department’s website aggregated demographic information about the artists whose works of art are subject to the provisions of this subdivision, to the extent such demographic information is provided to the department.
Section 224. 1. Green building standards.
Capital project. The term “capital project” means a capital project as defined in section 210 of this chapter that is paid for in whole or in part from the city treasury.
City agency. The term “city agency” means a city, county, borough, or other office, position, administration, department, division, bureau, board or commission, or a corporation, institution or agency of government, the expenses of which are paid, in whole or in part, from the city treasury.
Construction work. The term “construction work” means any work or operations necessary or incidental to the erection, demolition, assembling, alteration, installing, or equipping of any building.
Green building standards. The term “green building standards” means design guidelines, a rating system or rules for constructing buildings that ensure site planning, water efficiency, energy efficiency and renewable energy, conservation of materials and resources and indoor environmental quality.
Inflation. The term “inflation” shall mean the annual 12-month average of the consumer price index published by the United States department of labor.
LEED energy and atmosphere: optimize energy performance credit. The term “LEED energy and atmosphere: optimize energy performance credit” means the credit to achieve points under LEED for New Construction version 4 intended to achieve increased energy performance.
LEED green building rating system. The term “LEED green building rating system” means a version of the Leadership in Energy and Environmental Design (LEED) building rating system published by the U.S. Green Building Council, not less stringent than the selected green building rating system, including a standard developed by or for the city consisting of practices and technologies derived from the LEED rating system that are reasonable and appropriate for building in New York city.
LEED water efficiency: indoor water use reduction credit. The term “LEED water efficiency: indoor water use reduction credit” means the credit to achieve points under the LEED for New Construction version 4 intended to achieve water use reduction.
Not less stringent. The term “not less stringent” means providing no less net environmental and health benefits.
Occupancy group. The term “occupancy group” means occupancy group as classified in accordance with the New York city construction codes.
Rehabilitation work. The term “rehabilitation work” means any restoration, replacement or repair of any materials, systems and/or components.
Selected green building rating system. The term “selected green building rating system” means the U.S. Green Building Council; provided, however, at the mayor’s discretion, the term “selected green building rating system” shall mean] Building Design and Construction version 4, Building Operations and Maintenance version 4 or Interior Design and Construction version 4 of the building rating system published by the U.S. Green Building Council, whichever is most appropriate for the project under U.S. Green Building Council guidelines.
Substantial reconstruction. For buildings other than buildings classified in occupancy group R, the term “substantial reconstruction” means a capital project in which (i) the scope of work includes rehabilitation work in at least two of the following three major systems of the building: electrical, HVAC (heating, ventilating and air conditioning) and plumbing, and (ii) construction work affects at least 50 percent of the building’s floor area. For buildings classified in occupancy group R, the term “substantial reconstruction” means a capital project that includes (i) heating system replacement, (ii) work on at least 75 percent of dwelling units contained within such building, including but not limited to fixture replacements in kitchens and bathrooms, and (iii) substantial work on the building envelope, including but not limited to the addition of building wide air sealing measures performed in conjunction with window replacements on at least 50 percent of total glazing, addition of roof insulation on 100 percent of the roof or the addition of at least 50 percent wall insulation.
(2) In addition, if the estimated construction cost of a capital project required to comply with green building standards in accordance with paragraph (1) of this subdivision is $12,000,000 or more, such project shall be designed and constructed to reduce energy cost as follows; provided that this paragraph shall not apply to capital projects involving city-owned buildings or buildings classified in occupancy groups E or R:
(i) Capital projects with an estimated construction cost of $12,000,000 or more but less than $30,000,000 shall be designed and constructed to reduce energy cost by a minimum of 20 percent, as determined by the methodology prescribed in LEED energy and atmosphere: optimize energy performance credit or the New York state energy conservation code, whichever is more stringent. In addition to such 20 percent reduction in energy cost, the design agency shall make investments in energy efficiency that reduce energy cost by an additional five percent if it finds that the payback on such investment through savings in energy cost would not exceed seven years.
(ii) Capital projects with an estimated construction cost of $30,000,000 or more shall be designed and constructed to reduce energy cost by a minimum of 25 percent, as determined by the methodology prescribed in LEED energy and atmosphere: optimize energy performance credit or the New York state energy conservation code, whichever is more stringent. In addition to such 25 percent reduction in energy cost, the design agency shall make investments in energy efficiency that reduce energy cost by an additional five percent if it finds that the payback on such investment through savings in energy cost would not exceed seven years.
(3) For capital projects required to comply with paragraph (1) of this subdivision which are buildings classified in occupancy groups E, I-2 or in any occupancy group that, before the enactment of the local law adding this paragraph, was not required to comply with paragraph (1) of this subdivision, the mayor or an office or agency designated by the mayor may, in conjunction with the New York city economic development corporation, the New York city school construction authority and any other relevant offices or agencies, establish alternative design and construction standards. Such alternative standards may be as stringent or more stringent than the standards described by paragraph (1) of this subdivision. For buildings that are not classified in occupancy group E, such alternative standards may be less stringent than the standards described by paragraph (1) of this subdivision if the mayor or such designated office or agency determines that compliance with the standards described by such paragraph would be impracticable or unduly burdensome for a particular occupancy group; provided that such alternative standards may be less stringent than the standards described by such paragraph only to the minimum extent necessary and, except in the case of alternative standards prescribed for buildings classified in occupancy group R, shall be not less stringent than standards prescribed for buildings designed to achieve a LEED certified rating under version 4 of the LEED green building rating system. For buildings that are classified in occupancy group E, such alternative standards may be the New York city green schools guide in effect as of the effective date of the local law adding this paragraph, or the version of such guide designated by rule by the mayor or such designated office or agency; provided that such alternative standards are not less stringent than standards prescribed for buildings designed to achieve a LEED certified rating under version 4 of the LEED green building rating system. If the mayor or such designated office or agency establishes alternative standards under this paragraph, the mayor or such designated office or agency shall:
(i) Within 60 days after adopting such alternative standards, submit to the council and make publicly available online a report that, at a minimum:
(A) Describes such standards and the occupancy groups to which they will apply;
(B) Identifies any provisions in such standards that are less stringent than the standards described in paragraph (1) of this subdivision and, for each such provision, sets forth the reasons why compliance with the standards described in such paragraph would be impracticable or unduly burdensome for buildings classified in such occupancy groups;
(C) Except in the case of alternative standards prescribed for buildings classified in occupancy group R, describes how such alternative standards are not less stringent than the standards prescribed for buildings designed to achieve a LEED certified rating under version 4 of the LEED green building rating system; and
(ii) If such alternative standards are less stringent than the standards described in paragraph (1) of this subdivision, in every third fiscal year thereafter, submit to the council and make publicly available online a report that, at a minimum, states whether the mayor or such designated office or agency has determined that such less stringent standards continue to be necessary and, if so, a description of the reasons therefor and whether such standards can reasonably be made more stringent.
(1) Each capital project that includes the installation or replacement of a boiler at an estimated construction cost for such installation or replacement of $2,000,000 or more, or that involves the installation or replacement of lighting systems in a building at an estimated construction cost for such installation or replacement of $1,000,000 or more, shall be designed and constructed to reduce energy cost by a minimum of ten percent, as determined by the methodology prescribed in LEED energy and atmosphere: optimize energy performance credit or the New York state energy conservation code, whichever is more stringent; provided that compliance with this paragraph shall not be required for capital projects that would be subject to this paragraph solely because such project involves replacement of a boiler, unless the cost of such project equals or exceeds 50 percent of the cost of replacing the heating distribution system of such building.
(2) Each capital project, other than a project required to comply with paragraph (1) of this subdivision, that involves the installation or replacement of HVAC systems at an estimated construction cost for such installation or replacement of $2,000,000 or more, shall be designed and constructed to reduce energy cost by a minimum of five percent as determined by the methodology prescribed in LEED energy and atmosphere: optimize energy performance credit or the New York state energy conservation code, whichever is more stringent.
ASHRAE 90.1-2013. The term “ASHRAE 90.1-2013” means the 2013 edition of the energy standard for buildings except low-rise residential buildings, standard reference number 90.1-2013, published by the American society of heating, refrigerating and air conditioning engineers (ASHRAE).
Base building systems. The term “base building systems” has the same meaning as set forth in section 28-308.1 of the administrative code.
Design energy use intensity. The term “design energy use intensity” means, for a building, the source energy use intensity projected for such building based on its design at the time of filing with the department of buildings.
Energy use intensity baseline. The term “energy use intensity baseline” means, for a building either (i) the median source energy use intensity for buildings designed and constructed for similar uses according to benchmarking data obtained under article 309 of title 28 of the administrative code within the year preceding the effective date of the local law that added this paragraph or (ii) the design energy use intensity of such building if designed and constructed according to the prescriptive and mandatory requirements of ASHRAE 90.1-2013.
Low energy intensity building. The term “low energy intensity building” means (i) a building that is not classified in occupancy groups F or H and that has been designed and constructed such that its design energy use intensity is equal to or less than (A) the low energy intensity target for such building or (B) if the mayor, or an office or agency designated by the mayor, has adopted an alternative low energy intensity target pursuant to paragraph (3) of this subdivision, such alternative target or (ii) a building that is classified in occupancy groups F or H and that has been designed and constructed such that (A) the energy usage of its base building systems, exclusive of process loads, is equal to or less than the low energy intensity target for such building or, if the mayor, or an office or agency designated by the mayor, has adopted an alternative low energy intensity target pursuant to paragraph (3) of this subdivision, such alternative target for such building or (B) its design energy use intensity is at least 50 percent below the median source energy use intensity for buildings designed and constructed for similar uses according to benchmarking data obtained under article 309 of title 28 of the administrative code within the year preceding the effective date of the local law that added this paragraph.
Low energy intensity target. The term “low energy intensity target” means, (i) for a building that is not classified in occupancy groups F or H, the less stringent of (A) 50 percent below the energy use intensity baseline or (B) for new buildings, a source energy use intensity of 38 kBTU/yr per square foot of floor area and for additions to, or substantial reconstructions of, existing buildings, a source energy use intensity of 42 kBTU/yr per square foot of floor area and (ii) for a building classified in occupancy groups F or H, energy usage of the base building systems, exclusive of process loads, which is at least 50 percent less than such energy usage would be if such building were designed and constructed according to ASHRAE 90.1-2013.
Net zero energy building. The term “net zero energy building” means a building that has been designed and constructed to produce energy onsite from renewable energy sources in an amount equal to or greater than such building’s total energy needs.
Onsite energy generating building. The term “onsite energy generating building” means a building that has been designed and constructed to produce energy onsite from renewable energy sources in an amount equal to or greater than ten percent of such building’s total energy needs.
Renewable energy sources. The term “renewable energy sources” means qualified energy resources, as such term is defined in section 45 of title 26 of the United States code. Source energy use intensity. The term “source energy use intensity” means, for a building, the total energy used by such building in a year, including losses that take place during generation, transmission and distribution of such energy, divided by the building’s gross floor area.
(2) (i) Each capital project that involves the construction of a new city-owned building and each capital project that involves an addition to an existing city-owned building or the substantial reconstruction of an existing city-owned building, where such substantial reconstruction involves substantial work on the building envelope, shall be designed and constructed as a low energy intensity building.
(ii) For each capital project subject to subparagraph (i) of this paragraph the design agency shall consider the feasibility of designing and constructing such project as an onsite energy generating building.
(iii) For each capital project subject to subparagraph (i) of this paragraph with an estimated height of no more than three stories above grade, the design agency shall consider the feasibility of designing and constructing such project as a net zero energy building.
(iv) For each capital project subject to subparagraph (i) of this paragraph the design agency shall consider the feasibility of designing and constructing such project to incorporate green infrastructure.
(v) This paragraph shall apply only to capital projects which are added to the capital plan on or after July 1, 2017.
(3) The mayor, or an office or agency designated by the mayor, may establish an alternative low energy intensity target for buildings designed and constructed for a particular use, or for additions to, or substantial reconstructions of, existing buildings. Such alternative target may be equivalent to or more stringent than the low energy intensity target or, if the mayor or such designated office or agency determines that compliance with subparagraph (i) of paragraph (2) of this subdivision would be impracticable or unduly burdensome for such buildings or such work using the low energy intensity target, less stringent than such target. Where the mayor or such designated office or agency adopts such an alternative target, the mayor or such designated office or agency shall, no later than 60 days after such adoption, submit to the council and make publicly available online a report describing such alternative target and the types of buildings or work to which it will apply. If such alternative target is less stringent than the corresponding low energy intensity target, such report shall set forth the reasons that compliance with subparagraph (i) of paragraph (2) of this subdivision using such low energy intensity target would be impracticable or unduly burdensome for such types of buildings or work and, in each fiscal year thereafter, the mayor or such designated office or agency shall submit to the council and make publicly available online a report stating whether the mayor or such designated office or agency has determined that such alternative targets continue to be necessary and, if so, a description of the reasons therefor and whether such targets can reasonably be made more stringent.
(4) No later than January 1, 2017, the mayor shall submit to the speaker of the council and make publicly available online a plan for ensuring that by 2030 capital projects subject to paragraph (2) of this subdivision will be designed and constructed so that new buildings have a source energy use intensity no greater than 38 kBTU/yr per square foot of floor area and that additions to, or substantial reconstructions of, existing buildings have a source energy use intensity of no greater than 42 kBTU/yr per square foot of floor area. Such plan shall include a list of policies, programs and actions that the city will seek to undertake to achieve such targets.
(5) In 2019 and every third year thereafter, the mayor shall, by June 30 of such year, submit to the speaker of the council and make publicly available online a report containing, at a minimum, recommended practices for designing and constructing low energy intensity buildings.
(1) for each capital project subject to this section completed during the preceding fiscal year:
(i) a brief description of such project, including the total cost of the project;
(ii) the street address of such project and the community district and council district in which such project is located;
(iii) the estimated level of LEED certification such project has achieved as determined by the city agency that designed such project in accordance with the LEED green building rating system or, if applicable, the level achieved, as certified by the U.S. Green Building Council;
(iv) additional costs attributed to complying with the LEED green building rating system or any other green building standard;
(v) a statement as to whether such project has been designed and constructed as a low energy intensity building, onsite energy generating building or a net zero energy building and, for each project designed and constructed as a low energy intensity building, the low energy intensity target for such building or if the mayor, or an office or agency designated by the mayor, has adopted an alternative low energy intensity target pursuant to paragraph (3) of this subdivision, such alternative target;
(vi) if such capital project was not designed and constructed as an onsite energy generating building, a description of the reasons therefor, a statement as to whether such building has been designed and constructed to produce any energy onsite from renewable energy sources and, if so, the amount of such onsite energy production expressed as a percentage of the building’s total energy needs;
(vii) additional costs attributable to complying with the low energy intensity building requirements, the onsite energy generating requirements and the net zero energy building requirements of paragraph (2) of subdivision 1 of this section; and
(viii) an assessment of the health, environmental and energy-related benefits achieved in comparison with a base-case code compliant project, including projected energy savings and reductions in peak load, reductions in emissions and potable water use;
(2) for each capital project subject to paragraph (2) of subdivision l that was commissioned before the preceding fiscal year and that is not a low energy intensity building, a summary of remedial actions taken and to be taken and the anticipated or actual start and completion dates of such actions;
(3) a summary of agency findings related to additional investment in energy efficiency pursuant to subparagraphs (i) and (ii) of paragraph 2 of subdivision b of this section, including any additional investment in energy efficiency considered and the estimated payback time for such investment through savings in energy cost; and
(4) the total value of capital allocations in the preceding calendar year to projects exempted from the requirements of this section by the mayor pursuant to subdivision f of this section, and a list and brief description of each such project, including but not limited to square footage, project cost and the reason for such exemption, disaggregated by city agency.
Section 224. 2. Required energy conservation projects in city buildings.
Section 224. 3. Induction loop systems.
Assembly area. The term “assembly area” means an assembly area, as defined in section 106.5 of the 2010 Americans with Disabilities Act standards for accessible design, in which audible communication is integral to the use of the space, except that such term shall not include classrooms in schools; facilities primarily used to deploy first responders, courthouses and outdoor facilities such as athletic fields and stadiums.
Baseline construction cost. The term “baseline construction cost” means the total cost of a proposed capital project not including the cost of installing an assistive listening system.
Capital project. The term “capital project” means a capital project as defined in section 210 of this chapter that is paid for in whole or in part from the city treasury.
Editor’s note: L.L. 2017/051, 3/21/2017, eff. 1/1/2018, § 2 provides: “This local law takes effect on January 1, 2018, and applies to projects for which an application for construction document approval is filed with the department of buildings on and after such date, except that prior to such effective date the mayor or office or agency designated by the mayor shall take all actions necessary for the timely implementation of this local law, including the promulgation of rules.”